Water Main Installation & Renewal — QLD
QBCC-licensed civil plumbing contractor for water main installation, renewal, relining, service connections to property boundaries and connection to council mains across Brisbane and SE Queensland. WSA 03:2011, AS 2032 and AS 2033 compliant.
Water main installation and renewal for developers, councils and contractors
We deliver the full water main scope on residential subdivisions, commercial precincts and industrial estates across South-East Queensland — from greenfield DN100 reticulation and service connections to property boundaries through to large-diameter trunk main extensions connecting new growth areas to the council mains network.
Our work complies with WSAA WSA 03:2011, AS/NZS 3500.1, AS 2032 (UPVC installation) and AS 2033 (PE installation), together with the distributor-retailer's specific design and construction guidelines. We carry out all hold-point inspections and manage the documentation required to progress through your infrastructure agreement — from initial design submission through to conditional acceptance and handover.
We operate as both principal contractor (design-and-construct) and subcontractor. Civil contractors and developers can engage us directly under a fixed-price or schedule-of-rates subcontract. We attend all witness and hold points, coordinate the shut-down and tie-in with the distributor-retailer, and deliver the full as-constructed documentation package.
New water main installation
DN100–DN300 UPVC pressure pipe to AS 2032 for residential and commercial subdivision reticulation. Hydrant installations, gate valves, air valves and pressure reducing valves included.
Main renewal & relining
Pipe-in-pipe relining (HDPE slip-lining, CIPP) and open-cut renewal of deteriorated mains. Post-completion CCTV and pressure testing, with updated as-constructed documentation for asset management.
Service connections to property boundaries
Individual property service connections installed to AS/NZS 3500.1 and distributor-retailer standard connection details. Traffic control, road opening permits and reinstatement managed.
Connection to council mains
Live network connections and tie-ins to existing mains under live pressure. Shutdown coordination with QUU, Logan Water and Gold Coast Water. Disinfection, flushing and bacteriological clearance.
Infrastructure agreement support
Full documentation package — GPS as-constructeds in MGA94/12d, pressure test certificates, bacteriological clearances, material certifications to AS/NZS 4020.
Our water main delivery process
From design submission to conditional acceptance — how we manage water main projects from start to handover.
Design & approvals
We review the hydraulic design against WSA 03:2011 and the relevant distributor-retailer's design guidelines (QUU, Logan Water or Gold Coast Water). Where design-and-construct is required, we prepare or check hydraulic drawings, submit engineering design documentation and obtain all relevant infrastructure agreement approvals before breaking ground.
Excavation & pipe laying
All trenching is completed in accordance with AS/NZS 3500.1 and WSAA WorksSpecs. Pipe material — UPVC installed per AS 2032, HDPE per AS 2033, DI or MSCL depending on operating pressure and service conditions — is selected to specification. Bedding, haunching and backfill are placed and compacted to the relevant standard. All fittings, hydrants and valves are installed to alignment drawings.
Tie-ins & service connections
Live network tie-ins are coordinated directly with the distributor-retailer's asset management team. We manage the shutdown notice, isolation, disinfection and tie-in sequence to minimise supply interruption. Service connections to property boundaries are installed to AS/NZS 3500.1 and the distributor-retailer's standard connection detail. All connections are chlorine-dosed and swabbed in accordance with Australian Drinking Water Guidelines and WSAA procedures.
Pressure testing & disinfection
Every main is hydrostatically pressure-tested to 1.5× working pressure and held for the required duration under AS/NZS 3500.1. Chlorination, flushing and bacteriological sampling follows AS/NZS 4020 and AS 1657 procedures. All test records and lab results are provided to the distributor-retailer as part of the infrastructure agreement documentation package.
As-constructed documentation
GPS as-constructed drawings are produced in MGA94 coordinate system and exported to 12d format for submission to the distributor-retailer. Documentation includes: pipe schedule, material certification records, joint records, pressure test certificates, bacteriological clearance, and CCTV footage of any appurtenance installations. We manage the infrastructure agreement submission through to conditional acceptance.
Standards & compliance
Water main installation in Queensland must satisfy WSAA codes (WSA 03:2011), Australian Standards (AS 2032, AS 2033, AS/NZS 3500.1) and the relevant distributor-retailer's design guidelines. We deliver to all applicable standards and provide documentation to satisfy every hold point.
Water main FAQs
Common questions from developers, civil contractors and project managers about water main installation and renewal in SE Queensland.
What pipe materials do you use for water main installation in SEQ?
Do you carry out water main renewal and relining as well as new installation?
How do you manage a live water main tie-in without disrupting supply?
What documentation do you provide for a water main infrastructure agreement?
Which distributor-retailers are you familiar with in South-East Queensland?
Other civil plumbing services
Underground pipe networks, kerb drainage, WSUD treatment trains and GPT installation to AS/NZS 3500.3.
Gravity mains, pump stations, rising mains and lot connections. CCTV inspection and WSA 02:2014 compliant documentation.
Programmed CCTV condition assessment, high-pressure jetting, emergency response and trenchless rehabilitation. WSA 05:2013 aligned.
Submit a project enquiry
Whether you're tendering a subdivision, seeking a subcontractor for an infrastructure project, or need a maintenance contractor for an existing network — tell us about the scope and we'll respond with our capability and availability within one business day.
Project Enquiry Form
We respond to civil enquiries within one business day.