Stormwater Infrastructure & Drainage — QLD
Stormwater pit and pipe installation, open channel drainage, detention basins, inlet/outlet structures, WSUD compliance and council stormwater design compliance across Brisbane, Logan and Gold Coast. AS/NZS 3500.3 compliant with full ESC and council as-constructed documentation.
Stormwater drainage for developments across SEQ
We design and construct stormwater infrastructure for residential subdivisions, commercial and industrial sites, and civil infrastructure projects across South-East Queensland. Our scope covers underground stormwater pit and pipe networks, open channel drainage, detention basins, inlet/outlet structures, WSUD treatment trains, biofiltration rain gardens and gross pollutant trap installations.
All stormwater works are delivered to AS/NZS 3500.3, council stormwater design standards and the relevant local government's WSUD guidelines. We prepare or review erosion and sediment control (ESC) plans in accordance with the Queensland Environmental Protection Act 1994, and manage all CCTV inspection and documentation required for council stormwater infrastructure acceptance.
We operate as both principal contractor and civil plumbing subcontractor. For developers and civil contractors who need a licensed civil plumber to deliver the stormwater scope under their head contract, we provide a fixed-price or schedule-of-rates subcontract and attend all inspection hold points.
Stormwater pit & pipe installation
UPVC and RCCP stormwater pipe networks from DN150 to DN1200. Pre-cast and in-situ pit installations, kerb inlets, junction structures, headwalls and outlet protection.
Open channel drainage
Grassed swales, concrete-lined channels and earthen drains constructed to council-approved hydraulic design. Grade control structures and energy dissipators at outlets.
Detention basins
Earthworks, liner, inlet/outlet structures and erosion protection for on-site detention basins. Sized by hydraulic engineer to meet council peak flow attenuation requirements.
WSUD treatment trains
Biofiltration rain gardens, bioretention cells, sedimentation basins and inlet pre-treatment structures to Healthy Waterways WSUD Technical Design Guidelines for SEQ.
Council compliance documentation
ESC plans, GPS as-constructeds in MGA94 format, CCTV inspection footage and WSUD as-built confirmation for council stormwater design compliance and infrastructure acceptance.
How we deliver stormwater projects
From design review to council handover — our stormwater delivery process.
Stormwater design review
We review or prepare the stormwater design against AS/NZS 3500.3, council WSUD standards and the relevant local government's stormwater management guidelines. For design-and-construct engagements, we engage a civil hydraulic engineer to model the catchment, size the pipe network and design any water sensitive urban design (WSUD) treatment train elements — biofiltration basins, swales, detention basins and gross pollutant traps — in accordance with council requirements.
Pipe network & pit installation
Stormwater pit and pipe networks are installed to AS/NZS 3500.3 using UPVC stormwater pipe, RCCP (reinforced concrete), or HDPE depending on the design loadings, flow conditions and trench depth. Pre-cast and in-situ pits, gullies, kerb inlets, inlet/outlet structures and junction structures are installed to manufacturer specifications and bedded in accordance with AS/NZS 3725. All pipe bedding, haunching and backfill is placed in accordance with structural design requirements.
Open channel drainage & kerb works
Open channel drainage — grassed swales, concrete-lined channels and earthen drains — is constructed to the council-approved hydraulic design. Kerb and channel, lintel drains, side entry pits and kerb adaptors are installed in coordination with the road works contractor. Inlet and outlet levels are checked against finished road levels to confirm flow paths are clear of ponding risk.
Detention basins & WSUD structures
Detention basins, gross pollutant traps (GPTs), trash screens, sediment basins and biofiltration rain gardens are constructed in accordance with council WSUD guidelines and the Healthy Waterways WSUD Technical Design Guidelines for SEQ. We manage installation of pre-cast or in-situ structures, specialist filtration media placement and outlet protection to achieve the required pollutant load reduction targets.
Council compliance documentation & as-constructeds
All earthworks and drainage construction are managed under an erosion and sediment control (ESC) plan prepared in accordance with the Queensland Environmental Protection Act 1994 and IECA guidelines. On completion, GPS as-constructed drawings are produced in MGA94 format and submitted to council alongside CCTV inspection reports for any council-maintained drainage infrastructure, confirming compliance with council stormwater design requirements.
Standards & compliance
Stormwater construction in Queensland must satisfy AS/NZS 3500.3, council WSUD standards, the Queensland Environmental Protection Act 1994 and local government stormwater design guidelines. We deliver to all applicable standards and provide documentation confirming compliance at each stage.
Stormwater FAQs
Common questions from developers and civil contractors about stormwater infrastructure and council compliance in SE Queensland.
What is WSUD and how do I demonstrate council compliance on a development?
When is a detention basin required and how is it sized?
What stormwater pit and pipe materials do you install?
Do you manage erosion and sediment control compliance on construction sites?
What CCTV inspection and documentation is required for council stormwater handover?
Other civil plumbing services
Installation, extension, live tie-ins and pressure testing. WSA 03:2011 compliant with full infrastructure agreement documentation.
Gravity mains, pump stations, rising mains and lot connections. CCTV inspection and WSA 02:2014 compliant documentation.
Programmed CCTV condition assessment, high-pressure jetting, emergency response and trenchless rehabilitation. WSA 05:2013 aligned.
Submit a project enquiry
Whether you're tendering a subdivision, seeking a subcontractor for an infrastructure project, or need a maintenance contractor for an existing network — tell us about the scope and we'll respond with our capability and availability within one business day.
Project Enquiry Form
We respond to civil enquiries within one business day.